Send Message
Home ProductsWellhead Fittings

Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings

Certification
China XI‘AN ZZTOP OIL TOOLS CO.,LTD certification
China XI‘AN ZZTOP OIL TOOLS CO.,LTD certification
Customer Reviews
Great Job for providing qualifed equipment to us, Very impressive. My honor to work with your guys.

—— Akri Andreas

Hope the relationship can last stronger and stronger. Appreciate your valuble works.

—— Omar Rashid

My reliable partner, thanks for your support in last years, let us move next step... Good luck.

—— Pradeep Abraham

I'm Online Chat Now

Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings

Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings
Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings

Large Image :  Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings

Product Details:
Place of Origin: China
Brand Name: JC Wellhead
Certification: API 6A
Model Number: Pipe fitting
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Polywood case for land, air, ocean shipment
Delivery Time: 30-45 days
Payment Terms: T/T, L/C, D/P
Supply Ability: 300 sets / month

Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings

Description
Application: Wellhead Connection Usage: Oil & Gas Well Drilling Operation
Material: AISI 4130 Production Level: PLS 3
Temperature Class: U Standard: API 6A
Product Name: High Pressure Flow Control Fittings Working Pressure: 5000 Psi
Connection: Thread / Union
High Light:

AISI 4130 Wellhead Fittings

,

API 6A Wellhead Fittings

,

5000psi Elbow Tee Crossover Sub

API 6A Wellhead High Pressure Integral Fittings Elbow Tee Crossover Sub

 

The High pressure integral Fittings and welded fittings are used for wellhead connection in high pressure flow control service. The wellhead high pressure integral fittings include XY Wye, Elbow, Tee, Cross, Lateral and Fishtails with size ranging from 2” to 4” and pressure from 3000psi to 20000psi.

The Integral connections are made by high strength forged alloy steel which are all heat treated to enhance load-bearing capacity and lengthen service life. They may have union ends for quick and easy connection with various cementing or fracturing equipment, or have a welded end connector which is designed as per API Spec. 6A.

 

Type of wellhead pipe integral fittings

 

 

Wellhead flow control Integral fitting size working environment
Tee

2"

3"

42Mpa(6000psi)

70Mpa(10000psi)

105Mpa(15000psi)

Y-tee
manifold tee
cross tee
manifold cross
integral fitting

2" ×3"

2" ×4"

3" ×4"

Terminal connection type:

fig602-fig1002 fig602-fig1502

fig1002-fig1502

 


 

 Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings 0


Ordered high pressure wellhead piping fittings

 

SL. NO ITEM DESCRIPTION OF MATERIAL
1 Hammer Union 2" 1502 Hammer Union, Weld On Male & Female Coupling
2 Pup Joint 2" 1502 Pup Joint, Male X Female NPS Non-Detachable Nut, Length - 4 feet
3 Pup Joint 2" 1502 Pup Joint, Male X Female NPS Non-Detachable Nut, Length - 6 feet
4 Plug Valve 2" 1502 Male X Female Plug Valve (Low Torque Valve)
5 Chiksan Swivel Joint 2" 1502 Chiksan Swivel Joint, Male X Female, Style 10
6 Rubber Seal 2" 1502 O-Rubber Seal
7 2.1/16” RTJ Flange

2.1/16" 5000psi RTJ Weldneck Flange, (API 6A Flange, A105 Carbon Steel)

SCH-80, Outlet Size: 2”, Material Class: CC, Temperature Class: U, PSL2, PR2

8 Stud Bolt & Nut Stud Bolt (7/8" x 6.1/2") with 2 Nuts for above 2.1/16" 5000psi Flange
9 Gasket RX-24 Ring Gasket for 2.1/16” Flange
10 3.1/8” RTJ Flange

3.1/8" 5000psi RTJ Weldneck Flange, (API 6A Flange, A105 Carbon Steel)

SCH-80, Outlet Size: 3”, Material Class: CC, Temperature Class: U, PSL2, PR2

11 Stud Bolt & Nut Stud Bolt (1.1/8" x 7.3/4") with 2 Nuts for above 3.1/8" 5000psi Flange
12 Gasket RX-35 Ring Gasket for 3.1/8” Flange

 

Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings 1 Elbow Tee Crossover Sub AISI 4130 Wellhead Fittings 2


About JC Wellhead

 

JC Petroleum Equipment Factory manufactures and supplier the various wellhead equipment andrelated parts to meet different requirement in oilfield service operation. The wellhead equipment are conformed with API 6A and wellhead choke manifold is according to API16C specification, and  applied for high pressure and high temperature working condition.

 

With profession engineers we also offer the R&D service to the clients who have special requirements in the oilfield drilling operation and production operation.  The main well control and wellhead equipment as following:

 

*BOP : Taper Rubber Annular BOP, Spherical rubber Annular BOP, Single Ram BOP, Double Ram BOP

* Wellhead Equipment: X-mas tree, casing head, casing hanger, tubing head, tubing hanger, casing spool, tubing spool, API Clamp, API Clamp Hub

* Wellhead valve: Gate valve, Choke valve, Check valve, Mud valve, and valve parts

* Wellhead adapter: Double studded adapter flange, spacer spool, riser spool, drilling spool, weldneck flange, union flange adapter

* Other wellhead equipment parts: Hammer union, Elbow, swivel joint, block cross, Block Tee,

* Oil well manifold: choke manifold, kill manifold, testing manifold

 

Welcome to contact us for more information!

Contact Details
XI‘AN ZZTOP OIL TOOLS CO.,LTD

Contact Person: Lee M

Tel: 86-13319268557

Fax: 86-29-81779342

Send your inquiry directly to us (0 / 3000)